OpenBuildings™ Station Designer Help

Connect Back to First Floorplan

After the loop has been wired in the upper floor level, the next step is to wire back down to the first floorplan.

While you are still in the upper floorplan, open Cable Manager.
  1. Select (Cable Manager). Opens the Cable Manager dialog.


    Select the Model Link symbol in the list and then click > Connect below the Model Link <FROM> section.

    Opens the Select Level dialog.

  2. Select Level 1 and click OK. The Model Link ‹TO› section now has the entry: Level1,R1,CSS1. The connection to the lower floorplan has now been established. Close and save the current drawing, then open the first (lower) floorplan in Electrical discipline.